Print Page | Sign In | Create a Profile
Jackson MUA Six Flags Plant Tour hosted by YPC
Tell a Friend About This EventTell a Friend
Jackson MUA Six Flags Plant Tour hosted by YPC

Join the YPC in touring the construction site of a new 3 MGD pressure filtration water treatment plant and learn how the Jackson MUA supplies Six Flags Great Adventure.

8/2/2019
When: Friday, August 2, 2019
2:30 PM
Where: 3MGD WTP Construction Site
702 Perrineville Road
Jackson, NJ  08527
United States
Contact: Brittney Kovary
Laura.Norkute@amwater.com


Online registration is closed.
« Go to Upcoming Event List  

The new Six Flags Water Treatment Plant is a 3MGD Greensand Pressure Filter plant owned by the Jackson Township MUA.  The plant services the area with Six Flags being the majority user.  The plant is being built to replace the existing plant inside the park and allow for area expansion and development.  The construction cost is approximately $15 million including engineering.  The project commenced in June 2018 and is expected to be completed by June 2020.  The new plan is on schedule to be online by the end of 2019.  Project team includes; Coppola Services – Contractor, PS&S – Design Engineer, French and Perello – Resident Engineers, Jackson Township MUA – Owner, Six Flags Great Adventure.

This event will require registrants to bring their own PPE; hard hat, glasses, and proper footwear.

Dedicated to Safe Water in New Jersey

Quick Links

Connect

Contacts

50 E. Ridgewood Ave, PMB 183
Ridgewood, NJ 07450

Toll free: 1-866-436-1120

Email: info@njawwa.org